INFORMATION BLITZ: Paalala sa mga OFW-members ng PhilHealth: Ang PhilHealth membership and contribution ay MANDATORY ayon sa batas kaya magpamiyembro at magbayad ng kontribusyon bago umalis ng bansa. Seguraduhin ang proteksyon ng kalusugan ng iyong sarili at pamilya.

Friday, August 16, 2013

DILG-9 holds DED training for 2013 BUPB recipient-LGUs

By Franklin P. Gumapon

PAGADIAN CITY – Provincial and municipal engineers together with provincial/municipal planning development coordinators from 30 local government units (LGUs) in the region have converged here recently for an enhancement training on Detailed Engineering Design (DED) preparation.

Regional Information Officer Lemuel Mejares of the Department of Interior and Local Government (DILG)-9 said the participants came from the LGUs which received water system projects under the Bottom Up Planning and Budgeting (BUPB) with P1million allocation or more.

The training focused on the preparation of engineering designs for water supply projects in accordance with engineering standards to ensure smooth and sustainable operations.

Speaking before the participants, DILG-9 Regional Director Paisal O. Abutazil cited that “the failure of water supply systems is usually linked to poor design of the facilities.”

Besides, Abutazil also urged the LGUs to get updated on the new issuances and policies pertaining to procurement. “The LGUs should be updated on the new procurement policies since they will engage the services of a contractor for projects implemented by contract or they will be procuring supplies for projects implemented by administration,” he said.

Water supply project specialist, Engr. Ramon dela Torre, also told the participants that “the preparation of DED is one of the most critical stages of project implementation. Unlike other infrastructure projects, various elements have to be taken into consideration such as the complete drawing plans, specifications, cost estimates, design analysis, geo-resistivity and drilling test, among others.”

Engineer dela Torre also discussed the application of Epanet tools and practical skills on engineering design and standards in preparing the DED of water supply systems including the water source confirmation and hydraulic analysis.

On the other hand, State Auditor Eleazar Mantos apprised the participants of certain procedures, regulations and policies governing utilization, liquidation and reporting system of the project funds.

It can be recalled that 30 LGUs in region are now implementing the water supply system projects. These are the municipalities of Aurora, Dinas, Dumalinao, Labangan, Mahayag, Margosatubig, Midsalip, Molave, San Pablo, Sominot, Tabina, Tambulig, Tigbao and Tukuran in Zamboanga del Sur, Leon T. Postigo, Katipunan, Salug, Siayan, Roxas, Sergio Osmeña and Sindangan in Zamboanga del Norte, Alicia, Ipil, Mabuhay, Malangas, Naga, Olutanga, Talusan and Titay in Zamboanga Sibugay and Isabela City in Basilan Province. (PIA9)